HDB Painting Services in Singapore
Transform your HDB flat with professional painting services. From single rooms to whole unit painting, get quality workmanship with premium paints.
3+
Verified Contractors
24/7
Emergency Service
4.5+
Average Rating
Common Painting Issues & Costs
Whole Unit Painting
Complete interior painting
Single Room
Bedroom or living room
Feature Wall
Accent wall painting
Ceiling Painting
Including false ceiling
Wall Repair & Paint
Fix cracks before painting
When to Call a Painting Professional
- Moving into new flat
- Walls looking dull or dirty
- Paint peeling or cracking
- After water damage repair
- Before selling flat
Frequently Asked Questions
How long does HDB painting take?
3-room flat takes 3-4 days, 4-room takes 4-5 days, 5-room takes 5-7 days including preparation and drying time.
What paint brand is best for HDB?
Nippon, Dulux, and Jotun are popular choices. Most contractors offer 5-year warranty with quality paints.
Do I need to move out during painting?
Not necessary, but recommended for faster completion. Painters can work room by room if you stay during painting.
Need Painting Service Now?
Get quotes from verified contractors in your area
Find Painting ContractorsEmergency Painting Service
24/7 Available
For urgent painting issues, our emergency contractors can reach you within 30-60 minutes.
Find ServiceTop Painting Contractors
NEW TOKYO WALL DECORATION GENERAL CONTRACTOR
0.0 (0)
CAMOUFLAGE PAINTS & SERVICES LLP
0.0 (0)
WALLSPACE
0.0 (0)
Ad Space: service-sidebar (vertical)